ANALISIS EFEKTIVITAS MESIN PRODUKSI ASAM FOSFAT MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE)

Authors

  • Dika Rahayu Widiana PPNS
  • Nayya Kausalya PPNS
  • Nuke Amalia PPNS

Keywords:

Fishbone Diagram, OEE, Pareto Diagram, Phosphoric Acid, Six Big Losses

Abstract

This study aims to analyse the effectiveness of phosphoric acid production machinery during the 2023–2024 period using the Overall Equipment Effectiveness (OEE) method. Based on the calculation results, the performance rate aspect was found to have the lowest value compared to the other aspects. To identify the primary factors contributing to the low OEE value, a six big losses analysis was conducted. The results indicated that idling and minor stoppage contributed the highest percentage. This issue was then visualized using a Pareto diagram and elaborated through a Fishbone diagram approach incorporating the 6M aspects (Man, Method, Machine, Materials, Measurement, and Mother Nature/Environment). As strategic solutions, the recommended improvements include mitigating the risk of raw material stockouts by establishing an exclusive supply contract with suppliers and installing a generator set for critical components. The findings of this study are expected to reduce performance rate losses on the machinery and optimize the effectiveness of the phosphoric acid production line in the future.

References

Khan, F. I., & Abbasi, S. A. (1999). Major accidents in process industries and an analysis of causes and consequences. In Journal of Loss Prevention in the Process Industries (Vol. 12). www.elsevier.com/locate/jlp

Kennedy, R. K. (2018). Understanding, Measuring, and Improving Overall Equipment Effectiveness: How to Use OEE to Drive Significant Process Improvement. Retrieved http://taylorandfrancis.com

Mitsel, A. A., Grirorieva, M. V., & Dunaeva, T. Y. (2021). Assessment of overall equipment effectiveness according to OEE methodology. Journal of Physics: Conference Series, 1889(4). https://doi.org/10.1088/1742-6596/1889/4/042002

Muchiri, P., & Pintelon, L. (2008). Performance measurement using overall equipment effectiveness (OEE): Literature review and practical application discussion. International Journal of Production Research, 46(13), 3517–3535. https://doi.org/10.1080/00207540601142645

Musyafa’ah, M., & Sofiana, A. (2022). Analysis of Total Productive Maintenance (TPM) Application Using Overall Equipment Effectiveness (OEE) and Six Big Losses on Disamatic Machine PT. XYZ. OPSI, 15(1), 56. https://doi.org/10.31315/opsi.v15i1.6630

Nakajika, Seiichi. (1988). Introduction to TPM: Total Productive Maintenance. Productivity Press, Inc.

Saleem, F., Nisar, S., Khan, M. A., Khan, S. Z., & Sheikh, M. A. (2017). Overall equipment effectiveness of tyre curing press: A case study. Journal of Quality in Maintenance

Downloads

Published

2026-11-24

How to Cite

Dika Rahayu Widiana, Nayya Kausalya, & Nuke Amalia. (2026). ANALISIS EFEKTIVITAS MESIN PRODUKSI ASAM FOSFAT MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE). Prosiding Seminar Nasional Terapan Riset Inovatif (SENTRINOV), 12(1), 46–53. Retrieved from https://proceeding.isas.or.id/index.php/sentrinov/article/view/1807